Our express delivery services will resume on January 2nd. Until then, you can select our Best Price Delivery option. If you require urgent delivery please call our customer services on 0208 903 6333 (excluding Bank Holidays) and we will do our utmost to assist.
Our express delivery services will resume on January 2nd. Until then, you can select our Best Price Delivery option at checkout. If you require urgent delivery please call our customer services on 0208 903 6333 (excluding BH) and we will do our utmost to assist.
Please check stock availability above:
Fast Delivery - Usually delivered next working day. (12 noon Daily Cut-Off) Loading dates...
Standard Delivery - Usually delivered within 2 to 4 working days. Loading dates...
Best Price Delivery - Usually delivered within 5 to 10 working days. Loading dates...
Highlands and Island & Northern Ireland Delivery - Usually delivered within 2 to 4 working days. Loading dates...
*Please note that this product can be delivered to a UK mainland address ONLY
Sump Pump for Deep Basements The Delta Dual V6 Sump & Pump Unit is designed for use in deep basements, basements of more than one storey or where long discharge runs are required.
The Dual V6 are upgrades to the standard Dual V3 sump pumps where higher discharge heads are required. They can collect groundwater from a cavity drainage membrane system and light wells that totals up to 12m².
Groundwater enters via the membrane system and drainage channels and collects through the top opening of the sump or via three 110mm pipe inlets. The water is then pumped via two powerful V6 float-activated submersible pumps to mains drainage or another suitable outlet.
Dual V6 Sump Pump Installation The Delta Dual V6 Sump Unit has been designed with ease of installation in mind.
There are no specialist tools or skills required to install and all relevant adaptors are supplied.
The sump unit is delivered to site with all internal pipe work pre-installed. Only a simple screw on fitting is necessary to connect the pump. The unit is lowered into the excavation and all pipework and cable duct connections are made.
The pump station is filled with water to prevent flotation then back filled with 100mm concrete around the sump to form part of the floor slab. An access cover is set over the sump for maintenance purposes.